China Ductile Iron U-Bolted Mechanical Tee for Fire Fighting with ce certificate top quality Good price

Product Description

Product Description

1.Basic Details
 

Content  Ductile Iron (ASTM A536 Grade 65-45-twelve)
Gasket Material   EPDM
Area Remedy  Epoxy-(Pink)RAL3000, Epoxy-Orange, Epoxy powder painting,Sizzling Galvanized,
Dimensions  1″-12″
Functioning Stress 300PSI
Cerification  ISO 9001:2008,FM,UL,CCC and CE accredited
Link Conclude Type   Grooved finish ,Thread end 
Technology  Casting
Bolts and Nuts  ISO 898-1 Class8.8
Payment  by T/T,L/C
Packaging  In poly wooden circumstance,or in carton on the poly wood pallets,we can pack merchandise as for every custmon’s requirement.
Shipping detail normally inside of 15days,based on purchase amount.
Structure sort 1) Rigid CZPT ,Versatile CZPT , Decreasing Versatile CZPT
2) CZPT Radius and Short Radius Elbow (90°/45°/22.5°/11.25°)
3) Equal Tee, Grooved Decreasing Tee, Grooved Reduing Tee(Threaded outlet)
4) Grooved CZPT Tee,Grooved CZPT Cross
5) Equal Cross, Grooved Reducing Cross
6) Grooved Reducer, Threaded Reducer
7) Adapter Flange, Grooved Break up Flange
8) Cap,End Cap

two.Size and Spec
 

Nominal Dimension mm/in Pipe O.D mm/in Working Strain PSI/MPa Bolt Size  Dimensions mm/in Hole cuting dimensions
No.-Dimension mm A B C mm/in
25*15    33.7*21.3 300 M10 eighty five fifty fifty 24
one*½ one.375*.839 two.07 three.346 one.969 1.969 .945
twenty five*twenty      33.7*26.9      300 eighty five 50 fifty 24
one*¾ 1.327*1.059 2.07 3.346 1.969 1.969 .945
32*fifteen     forty two.4*21.3      300 ninety one forty one 58 thirty
1¼*½ 1.669*.839 2.07 three.583 one.614 2.283 one.181
32*twenty 42.4*26.nine 300 ninety one 44 58 30
1¼*¾ 1.669*1.059 two.07 3.583 one.732 2.283 1.181
32*25 forty two.4*33.seven three hundred ninety one fifty fifty eight thirty
1¼*one 1.669*1.327 2.07 3.583 one.969 two.283 one.181
forty*fifteen     forty eight.3*21.3 three hundred ninety one forty five 58 30
1½*½ 1.900*.839 two.07 3.583 one.772 two.283 1.181
forty*20 forty eight.3*26.nine three hundred ninety one 51 58 thirty
1½*¾ one.900*1.059 two.07 three.583 two.008 two.283 one.181
40*25 48.3*33.7 three hundred 91 fifty five fifty eight 30
1½*one one.900*1.327 2.07 3.583 two.a hundred sixty five 2.283 one.181
fifty*15    sixty.3*21.3 three hundred 95 53 58 30
two*½ 2.375*.839 two.07 3.740 two.087 two.283 one.181
fifty*20 60.3*26.nine 300 ninety five fifty seven 58 30
two*¾ two.375*1.059 2.07 3.740 2.244 2.283 one.181
fifty*twenty five sixty.3*33.seven three hundred ninety five sixty fifty eight 30
two*1 2.375*1.327 two.07 three.740 2.362 2.283 one.181
65*fifteen 73*21.3 300 a hundred and ten 60 fifty eight thirty
2½*½ 2.874*.839 two.07 4.331 2.362 2.283 1.181
sixty five*20 seventy three*26.9 300 110 sixty three fifty eight thirty
2½*¾ two.874*1.059 2.07 four.331 2.480 2.283 one.181
65*twenty five seventy three*33.seven three hundred one hundred ten sixty six 58 30
2½*one two.874*1.327 two.07 4.331 two.598 two.283 1.181
65*fifteen 76.1*21.three 300 110 sixty one fifty eight 30
3OD*½ 3*.839 two.07 4.331 two.402 two.283 1.181
sixty five*20 seventy six.1*26.nine 300 one hundred ten sixty four fifty eight thirty
3OD*¾ three*1.059 two.07 4.331 two.520 2.283 one.181
65*25 seventy six.1*33.7 three hundred one hundred ten 68 fifty eight thirty
3OD*1 3*1.327 two.07 four.331 2.677 2.283 1.181

3.Set up Instruction for U-Bolt CZPT Tee

1. Pipe Planning
Thoroughly clean the gasket sealing floor in 16mm of the hole and examine the sealing surface area visually for defects that might stop suitable sealing of the gasket. Do not drill the gap on weld line.
2. Remove burrs
Get rid of any burrs or slug before set up to shield the gasket and avert leakage.
three. Gasket&Housing Installation
Insert the gasket into outlet housing correctly. Align outlet housing more than the pipe gap generating positive that the finding collar is in the pipe hole.
four. Alignment
Connect the U-bolt from the other aspect and tighten the nuts.
five. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
six. Installation comprehensive
Warning
Proper torquing of bolts is required to receive specified efficiency.
-More than torquing the bolts may possibly result in hurt to the bolt and/or casting which could consequence in pipe joint separation.
-Below Torquing the bolts may possibly consequence in lower force retention abilities, reduce bend load abilities, joint leakage and pipe joint separation. Pipe joint separation might end result in considerable property harm and severe harm.

four.Variety of items

Rigid coupling, Adaptable coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, eleven.25° Elbow, Tee, Lowering Tee(Grooved/Threaded), Cross, Lowering Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.

5.Product Pic

6.Creation and shipping and delivery

seven.Certification and other goods present

8.Gasket
 

Gasket Materials Temperature Variety Recommendations  Colour
E EPDM -34ºC~+110ºC
(-30~+230ºC)
Advocate for hot water, dilute acid, oil-totally free gasoline and other mecmicals(except for hybrocarbon) within the specified temperature assortment. Not advise for petroleum and hydrocarbon. Green Strip
D NBR -29ºC~+82ºC
(-twenty~+180ºC)
Advisable for petroleum items, gasoline with oil vapors, mineral oil and vegetable oil. Not recommended for large temperature resources. Orange Strip
S Silicon CZPT -40ºC~+177ºC
(-forty~+350ºC)
Suggested for high temperature and dry air, and some large temperature chemical compounds. White
 

:
Application: As one particular of the most well-liked fittings in hearth combating systems, the grooved pipe fittings are widely utilised in fire preventing, air-conditioning, drinking water provide, sewage, cement, oil&fuel pipeline, mine piping and ordinary piping shipping and delivery. CZPT is spreading all more than the entire world and winning the appreciations from end users at residence and abroad.

How does a tapered bushing work? The tapered portion of the component is driven through a high-strength screw with a mating hub, allowing the bushing to be securely fixed to the shaft. The power of the clamp can transmit high torque (rotational pressure). This design and style guarantees that a productively set up sprocket and pulley shaft are aligned with basic positioning.
China Ductile Iron U-Bolted Mechanical Tee for Fire Fighting with ce certificate top quality Good price

Tags: