China Pipe Repair Clamp, Pipe Repair Collar, Split Collar, Leaking Pipe Quick Repair with ce certificate top quality Good price

Item Description

1. We are the supplier of Pipe Mend Clamps for H2o and Gas CZPT CZPT Networks in over one hundred Chinese Cities and some overseas international locations which includes British isles, Australia, Sri Lanka and so on.

2. Attributes of the solution: 

– consist of the two 50 percent forged iron pipe with good high quality h2o-proof rubber strip inside of
– the most econimical and effective way for the rush repair of the leakage or damaged of the pipeline. 
– you do not need take off the pipeline coupling from the body of pipeline following restore

three. The listing of dimensions :
 

S/N Suitable for Size Nominal Diameter W-Pipe Z-Pipe C-Pipe D-Pipe Coupling Size
OD OD OD OD   
      mm (+/-3mm) (+/-3mm) (+/-3mm) (+/-3mm) mm
one Metallic Pipe 20*a hundred twenty 26.nine 26.8       100
2 Metallic Pipe 25*one hundred 25 33.7 33.5       a hundred
3 Metallic Pipe forty*125 40 48.3 48.0       one hundred twenty five
4 Metallic Pipe 50*one hundred fifty 50 60.3 sixty.0       150
5 Metallic Pipe eighty*two hundred 80 88.five 89. 93. 98. 200
6 Metallic Pipe 80*250 250
7 Metallic Pipe 80*500 500
eight Metallic Pipe 100*two hundred 100 114. 114. 118. 118. 200
nine Metallic Pipe one hundred*250 250
10 Metallic Pipe 100*350 350
eleven Metallic Pipe a hundred*500 five hundred
12 Metallic Pipe 100*1000 one thousand
thirteen Metallic Pipe a hundred and fifty*two hundred 150 165. 165. 169. 170. two hundred
fourteen Metallic Pipe one hundred fifty*250 250
15 Metallic Pipe 150*350 350
sixteen Metallic Pipe one hundred fifty*five hundred 500
17 Metallic Pipe a hundred and fifty*a thousand one thousand
eighteen Metallic Pipe 200*two hundred 200 219. 219. 220. 220. 200
19 Metallic Pipe two hundred*250 250
twenty Metallic Pipe two hundred*350 350
21 Metallic Pipe 200*five hundred 500
22 Metallic Pipe 200*one thousand one thousand
23 Metallic Pipe 250*200 250 273.0    271.6 274. 200
24 Metallic Pipe 250*250 250
25 Metallic Pipe 250*350 350
26 Metallic Pipe 250*500 500
27 Metallic Pipe 250*1000 1000
28 Metallic Pipe 300*two hundred 300 325.0    322.8 326. two hundred
29 Metallic Pipe 300*250 250
30 Metallic Pipe 300*350 350
31 Metallic Pipe 300*five hundred five hundred
32 Metallic Pipe 300*one thousand a thousand
33 Metallic Pipe 350*two hundred 350       374. 378. two hundred
33 Metallic Pipe 350*350 350
34 Metallic Pipe 350*500 five hundred
35 Metallic Pipe 350*a thousand 1000
36 Metallic Pipe 400*two hundred 400 426.0    425.6 429. two hundred
36 Metallic Pipe 400*five hundred 500
34 Metallic Pipe four hundred*1000 1000
34.5 Metallic Pipe 450*500 450       476.eight 480. 500
34.two Metallic Pipe 450*1000 one thousand
33.nine Metallic Pipe 500*500 500 530.0    528. 532. five hundred
36 Metallic Pipe 500*a thousand 1000
37 Metallic Pipe 600*five hundred 600       630.eight 635. 500
38 Metallic Pipe 600*one thousand 1000
39 Metallic Pipe seven hundred*500 700       733. 738. five hundred
40 Metallic Pipe seven-hundred*one thousand 1000
forty one Metallic Pipe 800*500 800       836. 842. five hundred
42 Metallic Pipe 800*a thousand a thousand
43 Metallic Pipe 900*five hundred 900       939. 945. 500
44 Metallic Pipe 900*a thousand a thousand
45 Metallic Pipe 1000*500 1000       1041. 1048. 500
46 Metallic Pipe 1000*one thousand a thousand
47 Metallic Pipe 1200*500 1200       1246. 1255. 500
48 Metallic Pipe 1200*1000 one thousand
forty nine Metallic Pipe 1400*500 1400          1462. five hundred
fifty Metallic Pipe 1400*1000 1000
51 Metallic Pipe 1600*1000 1600          1688. one thousand
Note:                         
1. Appropriate for the physique of the solid iron pipe and ductile iron pipe
2. W-Pipe: Welded steel pipeline, Z-Pipe: Zinc-plated steel pipeline
C-Pipe: Forged iron pipeline, D-Pipe: Ducitile iron pipeline

S/N Suitable for Size Nominal Diameter W-Pipe Coupling Size
OD
1 Steel Pipe 800*five hundred 800 820 500
two Metal Pipe 800*one thousand one thousand
three Steel Pipe one thousand*five hundred 1000 1571 500
four Metal Pipe a thousand*1000 a thousand
5 Metal Pipe 1200*500 1200 1220 five hundred
6 Metal Pipe 1200*a thousand a thousand
7 Metal Pipe 1400*500 1400 1422 500
8 Steel Pipe 1400*a thousand 1000
Note: Ideal for the human body of metal pipe

S/N Suitable for Size Nominal Diameter OD ( outside diameter) Coupling Length    
        SRCP PRCP        
          Stage 1 Phase 3   
1 Concrete Pipe one hundred*three hundred 100 150       three hundred
two Concrete Pipe a hundred and fifty*300 150 200       300
3 Concrete Pipe two hundred*three hundred two hundred 260       three hundred
four Concrete Pipe three hundred*500 300 380       500
five Concrete Pipe four hundred*500 400 490 500 506. five hundred
Note: SRCP: Self-pressured strengthened concrete pipeline
PRCP: Pre-pressured reinforced concrete pipeline

S/N Suited for Size OD Coupling Duration
one Plastic Pipe P63*two hundred sixty three 200
2 Plastic Pipe P75*200 75 200
3 Plastic Pipe P90*two hundred 90 two hundred
four Plastic Pipe P90*250 250
5 Plastic Pipe P90*five hundred 500
6 Plastic Pipe P110*200 110 200
seven Plastic Pipe P110*250 250
8 Plastic Pipe P110*500 five hundred
nine Plastic Pipe P110*1000 one thousand
10 Plastic Pipe P125*two hundred 125 200
eleven Plastic Pipe P125*500 500
twelve Plastic Pipe P140*200 a hundred and forty 200
13 Plastic Pipe P160*200 160 two hundred
fourteen Plastic Pipe P160*five hundred five hundred
15 Plastic Pipe P160*a thousand a thousand
sixteen Plastic Pipe P180*200 one hundred eighty 200
17 Plastic Pipe P200*two hundred 200 two hundred
18 Plastic Pipe P200*500 500
19 Plastic Pipe P200*a thousand 1000
twenty Plastic Pipe P225*200 225 two hundred
21 Plastic Pipe P225*500 500
22 Plastic Pipe P225*one thousand 1000
23 Plastic Pipe P250*500 250 500
24 Plastic Pipe P250*one thousand a thousand
twenty five Plastic Pipe P280*five hundred 280 500
26 Plastic Pipe P280*1000 one thousand
27 Plastic Pipe P315*two hundred 315 two hundred
28 Plastic Pipe P315*500 five hundred
29 Plastic Pipe P315*1000 1000
30 Plastic Pipe P355*five hundred 355 500
31 Plastic Pipe P355*a thousand 1000
32 Plastic Pipe P400*five hundred 400 500
32 Plastic Pipe P400*a thousand a thousand
32 Plastic Pipe P450*500 450 500
32 Plastic Pipe P450*a thousand 1000
32 Plastic Pipe P500*five hundred 500 five hundred
33 Plastic Pipe P500*one thousand one thousand
34 Plastic Pipe P630*500 630 500
35 Plastic Pipe P630*one thousand 1000
36 Plastic Pipe P710*one thousand 710 1000
37 Plastic Pipe P800*500 800 five hundred

A tapered bushing, also known as a tapered lock bushing, is a tapered, non-flanged, split bushing whose tapered sleeve is possibly screwed or tightened with a socket head cap screw and squeezed onto the shaft so that It is mounted on the shaft. Shields a vast variety of pulleys, sprockets, flanged hubs, and couplings. These bushings are utilised in pulleys and sprockets to improve clamping force, even though standard bore merchandise lock on to the shaft only with a keyway and established screw. All bushings provided by EP are individually created of substantial-quality material and boxed grub screws.
China Pipe Repair Clamp, Pipe Repair Collar, Split Collar, Leaking Pipe Quick Repair with ce certificate top quality Good price

Tags: