China Straight Repair Clamps P315X200 with ce certificate top quality Good price

Solution Description

1.We are the supplier of Leaking Pipe Fix Clamps for H2o and Fuel CZPT Networks in in excess of 100 Chinese Towns and some foreign international locations like United kingdom, Australia, Sri Lanka and so on.

2. Features of the solution:

– consist of the two 50 % forged iron pipe with great good quality h2o-evidence rubber strip inside of
– the most econimical and efficient way for the hurry fix of the leakage or damaged of the pipeline. 
– you do not want just take off the pipeline coupling from the body of pipeline soon after mend

3. The list of measurements :
 

S/N Suitable for Size Nominal Diameter W-Pipe Z-Pipe C-Pipe D-Pipe Clamp Length
OD OD OD OD   
      mm (+/-3mm) (+/-3mm) (+/-3mm) (+/-3mm) mm
1 Metallic Pipe 20*one hundred 20 26.nine 26.8       100
two Metallic Pipe twenty five*a hundred 25 33.seven 33.5       a hundred
3 Metallic Pipe 40*a hundred twenty five 40 forty eight.three forty eight.0       one hundred twenty five
4 Metallic Pipe fifty*150 50 60.3 60.0       one hundred fifty
five Metallic Pipe 80*200 80 88.5 89. 93. 98. two hundred
six Metallic Pipe eighty*250 250
seven Metallic Pipe eighty*five hundred five hundred
eight Metallic Pipe one hundred*two hundred 100 114. 114. 118. 118. two hundred
9 Metallic Pipe one hundred*250 250
ten Metallic Pipe 100*350 350
eleven Metallic Pipe 100*five hundred 500
12 Metallic Pipe one hundred*a thousand a thousand
13 Metallic Pipe a hundred and fifty*200 150 165. 165. 169. 170. 200
14 Metallic Pipe 150*250 250
fifteen Metallic Pipe a hundred and fifty*350 350
sixteen Metallic Pipe a hundred and fifty*five hundred five hundred
seventeen Metallic Pipe 150*1000 one thousand
18 Metallic Pipe 200*200 200 219. 219. 220. 220. 200
19 Metallic Pipe two hundred*250 250
twenty Metallic Pipe 200*350 350
21 Metallic Pipe two hundred*five hundred 500
22 Metallic Pipe 200*one thousand 1000
23 Metallic Pipe 250*two hundred 250 273.0    271.six 274. 200
24 Metallic Pipe 250*250 250
25 Metallic Pipe 250*350 350
26 Metallic Pipe 250*five hundred five hundred
27 Metallic Pipe 250*a thousand one thousand
28 Metallic Pipe three hundred*200 300 325.0    322.eight 326. 200
29 Metallic Pipe 300*250 250
thirty Metallic Pipe 300*350 350
31 Metallic Pipe 300*500 500
32 Metallic Pipe 300*one thousand a thousand
33 Metallic Pipe 350*two hundred 350       374. 378. two hundred
33 Metallic Pipe 350*350 350
34 Metallic Pipe 350*five hundred five hundred
35 Metallic Pipe 350*one thousand a thousand
36 Metallic Pipe four hundred*200 400 426.0    425.6 429. two hundred
36 Metallic Pipe four hundred*500 five hundred
34 Metallic Pipe four hundred*one thousand a thousand
34.5 Metallic Pipe 450*five hundred 450       476.eight 480. 500
34.two Metallic Pipe 450*1000 one thousand
33.nine Metallic Pipe 500*five hundred 500 530.0    528. 532. five hundred
36 Metallic Pipe five hundred*1000 a thousand
37 Metallic Pipe 600*500 600       630.eight 635. five hundred
38 Metallic Pipe 600*one thousand 1000
39 Metallic Pipe seven-hundred*five hundred 700       733. 738. 500
40 Metallic Pipe seven hundred*one thousand 1000
41 Metallic Pipe 800*five hundred 800       836. 842. 500
42 Metallic Pipe 800*a thousand 1000
43 Metallic Pipe 900*500 900       939. 945. five hundred
44 Metallic Pipe 900*1000 one thousand
45 Metallic Pipe one thousand*five hundred 1000       1041. 1048. five hundred
46 Metallic Pipe a thousand*a thousand 1000
47 Metallic Pipe 1200*500 1200       1246. 1255. five hundred
forty eight Metallic Pipe 1200*1000 1000
49 Metallic Pipe 1400*500 1400          1462. 500
50 Metallic Pipe 1400*1000 a thousand
fifty one Metallic Pipe 1600*one thousand 1600          1688. one thousand
Be aware:                         
1. Appropriate for the entire body of the cast iron pipe and ductile iron pipe
2. W-Pipe: Welded metal pipeline, Z-Pipe: Zinc-plated steel pipeline
C-Pipe: Solid iron pipeline, D-Pipe: Ducitile iron pipeline

S/N Suitable for Size Nominal Diameter W-Pipe Coupling Length
OD
one Steel Pipe 800*500 800 820 five hundred
two Metal Pipe 800*one thousand one thousand
three Metal Pipe one thousand*500 1000 1571 500
four Metal Pipe 1000*a thousand a thousand
five Metal Pipe 1200*500 1200 1220 500
6 Steel Pipe 1200*one thousand one thousand
7 Steel Pipe 1400*500 1400 1422 500
eight Steel Pipe 1400*one thousand one thousand
Note: Suitable for the human body of metal pipe

S/N Suitable for Size Nominal Diameter OD ( outside diameter) Coupling Length    
        SRCP PRCP        
          Phase 1 Stage 3   
1 Concrete Pipe a hundred*300 a hundred 150       three hundred
two Concrete Pipe 150*300 a hundred and fifty 200       three hundred
three Concrete Pipe two hundred*three hundred 200 260       300
four Concrete Pipe three hundred*five hundred three hundred 380       500
5 Concrete Pipe four hundred*500 four hundred 490 500 506. 500
Note: SRCP: Self-pressured strengthened concrete pipeline
PRCP: Pre-pressured bolstered concrete pipeline

S/N Ideal for Measurement OD Coupling Length
one Plastic Pipe P63*200 sixty three 200
two Plastic Pipe P75*200 75 200
three Plastic Pipe P90*two hundred 90 200
4 Plastic Pipe P90*250 250
5 Plastic Pipe P90*500 500
6 Plastic Pipe P110*two hundred 110 200
seven Plastic Pipe P110*250 250
eight Plastic Pipe P110*500 500
9 Plastic Pipe P110*a thousand a thousand
10 Plastic Pipe P125*two hundred 125 two hundred
eleven Plastic Pipe P125*500 five hundred
12 Plastic Pipe P140*200 140 two hundred
13 Plastic Pipe P160*200 160 200
14 Plastic Pipe P160*500 five hundred
fifteen Plastic Pipe P160*one thousand 1000
16 Plastic Pipe P180*two hundred one hundred eighty 200
17 Plastic Pipe P200*200 200 two hundred
eighteen Plastic Pipe P200*500 500
19 Plastic Pipe P200*1000 a thousand
twenty Plastic Pipe P225*200 225 200
21 Plastic Pipe P225*five hundred 500
22 Plastic Pipe P225*1000 a thousand
23 Plastic Pipe P250*five hundred 250 500
24 Plastic Pipe P250*1000 a thousand
25 Plastic Pipe P280*five hundred 280 five hundred
26 Plastic Pipe P280*one thousand one thousand
27 Plastic Pipe P315*200 315 200
28 Plastic Pipe P315*five hundred 500
29 Plastic Pipe P315*1000 a thousand
30 Plastic Pipe P355*500 355 five hundred
31 Plastic Pipe P355*one thousand 1000
32 Plastic Pipe P400*five hundred 400 five hundred
32 Plastic Pipe P400*a thousand a thousand
32 Plastic Pipe P450*500 450 500
32 Plastic Pipe P450*1000 1000
32 Plastic Pipe P500*500 500 five hundred
33 Plastic Pipe P500*one thousand a thousand
34 Plastic Pipe P630*500 630 five hundred
35 Plastic Pipe P630*a thousand a thousand
36 Plastic Pipe P710*a thousand 710 a thousand
37 Plastic Pipe P800*five hundred 800 500

Tapered sockets are developed for rapid assembly and disassembly of pulleys and other transmission gear with out the need to have for specific instruments other than a hex crucial. Various machined holes make sure fast group, staying away from pricey manufacturing facility downtime. Bushings are keyways machined to British Standard Requirements. This is in addition to the clamping screw, which is adequate for the necessary torque in many situations. Tightening with a tapered bushing eliminates any gap among the hub and the bore, which removes fretting corrosion.
China Straight Repair Clamps P315X200 with ce certificate top quality Good price

Tags: