China U-Bolts Mechanical Tee with FM/UL/CE Approved with ce certificate top quality Good price

Item Description

1.Standard Data
 

Materials  Ductile Iron (ASTM A536 Quality 65-forty five-12)
Gasket Material   EPDM
Surface Treatment  Epoxy-(Crimson)RAL3000, Epoxy-Orange, Epoxy powder painting,Scorching Galvanized,
Dimension  1″-twelve”
Operating Strain 300PSI
Cerification  ISO 9001:2008,FM,UL,CCC and CE accredited
Connect Conclude Type   Grooved finish ,Thread end 
Technological innovation  Casting
Bolts and Nuts  ISO 898-1 Class8.eight
Payment  by T/T,L/C
Packaging  In poly wood case,or in carton on the poly picket pallets,we can pack merchandise as for each custmon’s prerequisite.
Shipping detail typically inside 15days,based on get quantity.
Structure sort 1) Rigid CZPT ,Adaptable CZPT , Minimizing Adaptable CZPT
2) CZPT Radius and Brief Radius Elbow (90°/45°/22.5°/11.25°)
three) Equivalent Tee, Grooved Lowering Tee, Grooved Reduing Tee(Threaded outlet)
four) Grooved CZPT Tee,Grooved CZPT Cross
five) Equivalent Cross, Grooved Reducing Cross
6) Grooved Reducer, Threaded Reducer
seven) Adapter Flange, Grooved Break up Flange
8) Cap,Conclude Cap

two.Dimensions and Spec
 

Nominal Measurement mm/in Pipe O.D mm/in Working Pressure PSI/MPa Bolt Size  Dimensions mm/in Gap cuting proportions
No.-Dimension mm A B C mm/in
25*fifteen    33.7*21.three three hundred M10 85 fifty fifty 24
one*½ one.375*.839 2.07 3.346 1.969 one.969 .945
25*twenty      33.7*26.9      three hundred 85 fifty 50 24
one*¾ one.327*1.059 two.07 three.346 1.969 1.969 .945
32*15     42.4*21.3      300 ninety one 41 58 thirty
1¼*½ 1.669*.839 2.07 three.583 1.614 two.283 one.181
32*twenty forty two.4*26.nine 300 ninety one forty four fifty eight 30
1¼*¾ one.669*1.059 two.07 three.583 1.732 two.283 1.181
32*25 forty two.4*33.seven 300 91 fifty fifty eight 30
1¼*one one.669*1.327 2.07 3.583 1.969 two.283 1.181
40*fifteen     forty eight.3*21.three three hundred 91 forty five 58 30
1½*½ 1.900*.839 two.07 three.583 one.772 two.283 one.181
40*20 forty eight.3*26.9 three hundred ninety one 51 fifty eight thirty
1½*¾ 1.900*1.059 2.07 three.583 2.008 2.283 one.181
40*25 forty eight.3*33.seven 300 91 fifty five fifty eight 30
1½*one one.900*1.327 2.07 three.583 2.one hundred sixty five two.283 1.181
50*fifteen    sixty.3*21.three 300 ninety five fifty three 58 thirty
two*½ 2.375*.839 2.07 3.740 two.087 two.283 1.181
fifty*twenty sixty.3*26.9 three hundred 95 fifty seven fifty eight 30
2*¾ 2.375*1.059 2.07 3.740 2.244 2.283 1.181
fifty*twenty five 60.3*33.7 three hundred 95 sixty 58 30
2*one two.375*1.327 2.07 3.740 two.362 two.283 1.181
sixty five*15 73*21.three 300 110 60 fifty eight 30
2½*½ 2.874*.839 2.07 4.331 two.362 two.283 one.181
65*20 seventy three*26.nine 300 one hundred ten 63 58 30
2½*¾ two.874*1.059 two.07 four.331 two.480 two.283 1.181
sixty five*twenty five 73*33.seven three hundred 110 66 fifty eight thirty
2½*1 2.874*1.327 2.07 four.331 2.598 2.283 one.181
sixty five*fifteen 76.1*21.3 three hundred 110 61 fifty eight 30
3OD*½ three*.839 2.07 4.331 two.402 two.283 1.181
65*20 seventy six.1*26.9 300 110 sixty four fifty eight thirty
3OD*¾ three*1.059 2.07 four.331 2.520 2.283 1.181
65*twenty five 76.1*33.seven 300 110 sixty eight 58 30
3OD*1 three*1.327 2.07 4.331 2.677 two.283 1.181

three.Set up Instruction for U-Bolt CZPT Tee

1. Pipe Planning
Cleanse the gasket sealing surface within 16mm of the gap and inspect the sealing surface area visually for defects that may possibly avert correct sealing of the gasket. Don’t drill the hole on weld line.
two. Remove burrs
Get rid of any burrs or slug ahead of installation to shield the gasket and avoid leakage.
three. Gasket&Housing Installation
Insert the gasket into outlet housing effectively. Align outlet housing over the pipe gap producing confident that the finding collar is in the pipe hole.
4. Alignment
Connect the U-bolt from the other aspect and tighten the nuts.
five. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
six. Installation complete
Warning
Suitable torquing of bolts is needed to obtain specified performance.
-In excess of torquing the bolts may outcome in injury to the bolt and/or casting which could outcome in pipe joint separation.
-Underneath Torquing the bolts may possibly end result in lower force retention abilities, reduce bend load abilities, joint leakage and pipe joint separation. Pipe joint separation may possibly end result in important house hurt and severe damage.

4.Range of items

Rigid coupling, Adaptable coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, 11.25° Elbow, Tee, Reducing Tee(Grooved/Threaded), Cross, Minimizing Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.

5.Item Pic

six.Generation and shipping

7.Certification and other items display

eight.Gasket
 

Gasket Materials Temperature Selection Recommendations  Shade
E EPDM -34ºC~+110ºC
(-30~+230ºC)
Advise for hot water, dilute acid, oil-cost-free gasoline and other mecmicals(except for hybrocarbon) within the specified temperature selection. Not recommend for petroleum and hydrocarbon. Inexperienced Strip
D NBR -29ºC~+82ºC
(-twenty~+180ºC)
Advisable for petroleum merchandise, gas with oil vapors, mineral oil and vegetable oil. Not advised for high temperature components. Orange Strip
S Silicon CZPT -40ºC~+177ºC
(-40~+350ºC)
Advisable for higher temperature and dry air, and some higher temperature substances. White
 

:
Software: As 1 of the most popular fittings in fire preventing programs, the grooved pipe fittings are extensively used in hearth combating, air-conditioning, h2o supply, sewage, cement, oil&fuel pipeline, mine piping and normal piping shipping and delivery. CZPT is spreading all over the world and successful the appreciations from consumers at house and overseas.
 

Set up 1.1. Thoroughly clean all oil, grime and paint from shafts, bushing holes, bushing exterior and holes of components (sprockets, pulleys, and so forth.). Insert the bushing into the assembly. 3. Match the pattern of holes, not threaded holes (every single gap is threaded on one facet only). Insert the socket head cap screws or screws into the 50 percent-threaded holes shown in the impression beneath. Install the assembly on the shaft. 4. Transform the torque location or cover screw* to the suggested torque location in the diagram underneath. Fill any unfilled holes with grease.
China U-Bolts Mechanical Tee with FM/UL/CE Approved with ce certificate top quality Good price

Tags: